How to reduce installation clashes on site?

Even a good drawing cannot replace an agreed work sequence. Review the points where electrical work, other services and finishes come together.

Agree space for service routes

Before installation, compare containment routes with ventilation, plumbing and the structure. Consider levels, crossings and installation access. Raise discrepancies before ordering dimension-dependent components.

Plan sequencing and work areas

Agree which activities precede electrical work and which follow it. Delayed painting, inaccessible rooms or missing deliveries can change the plan. Maintain one current list of available work areas and decisions.

Consider use and handover

Equipment must remain accessible for operation and maintenance. Before closing ceilings or enclosures, agree required checks, photographs and records. Share changes with the designer and those responsible for as-built drawings.