When should you start arranging site power?

Discuss the supply alongside the construction programme. The start date alone does not establish the power demand or distribution points needed.

Collect requirements from contractors

List equipment, ratings, simultaneous use and dates. Flag equipment whose downtime will stop other trades. Machine supplier information is a better starting point than estimates based only on site size.

Distinguish the procedure from installation

Check progress with the operator: application, conditions, agreement and required documents. On-site electrical work is a separate scope. A coordinated programme should show both streams and their dependencies.

Allow for the site to develop

Plan boards, routes and connection points for later stages and site movement. Report relocated facilities or additional equipment before connection. Confirm the operator’s dates through the actual connection case.